{"id":17450,"date":"2024-08-29T16:56:15","date_gmt":"2024-08-29T20:56:15","guid":{"rendered":"https:\/\/beaconny.gov\/?p=17450"},"modified":"2024-08-30T09:40:57","modified_gmt":"2024-08-30T13:40:57","slug":"rehabilitation-of-fishkill-and-teller-avenues-project-updates","status":"publish","type":"post","link":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/","title":{"rendered":"Rehabilitation of Fishkill and Teller Avenues Project Updates"},"content":{"rendered":"<p><strong>Fishkill Avenue and Teller Avenue Rehabilitation Project<\/strong><\/p>\n<p><em>Project updates will be updated here, as available.<\/em><\/p>\n<p><em>Project plans can be viewed <a href=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/20240227-Fishkill-and-Teller-Ave-Plans-FINAL.pdf\">here<\/a>.<\/em><\/p>\n<p><strong>August 29, 2024:<\/strong> After more than twenty years of planning, engineering, right-of-way acquisition, and regulatory approvals, in June 2024, the City of Beacon began work on the rehabilitation of Fishkill and Teller Avenues (the \u201cProject.\u201d) The $9 million Project is 95 percent funded through federal and state transportation grants and is anticipated to be completed by July 2025.<\/p>\n<p>The Project area covers Teller Avenue from Wolcott Avenue (Route 9D) to Main Street and Fishkill Avenue from Main Street to Blackburn Avenue. The Project will replace all existing sidewalks with new 5-foot-wide concrete sidewalks, install new curbing, replace drainage structures throughout the Project area, and repave and restripe the roadway during its final phase.<\/p>\n<p>The Project also includes safety improvements, including adding a Leading Pedestrian Interval signaling at the intersection of Teller Avenue\/ Fishkill Avenue and Main Street, installing two raised pedestrian crosswalks near Memorial Park (\u201cspeed tables\u201d), and reconfiguring the intersection at Teller Avenue and Wolcott Avenue as a \u201cT\u201d intersection, with the George Washington monument moved to the north side of Teller Avenue. The City is also currently negotiating to extend the sidewalk replacement work further from Blackburn Avenue towards the Town of Fishkill border, if funding allows.<\/p>\n<p>As of the end of August 2024, many areas of the sidewalk have already been removed and replaced, although some areas have been bypassed. These areas that have not been touched or have been temporarily paved are areas where drainage pipes and\/or catch basins will be installed. These items have a long lead time and will not be installed until later in the fall, after which these areas will be finished with new sidewalks.<\/p>\n<p>The City apologizes for the inconvenience as we work to upgrade this critical corridor after more than two decades of planning. We appreciate your patience and understanding. Questions can be emailed to Chris White, City Administrator at <a href=\"mailto:cwhite@beaconny.gov\">cwhite@beaconny.gov<\/a><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17454 alignleft\" src=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3991-300x225.jpg\" alt=\"\" width=\"476\" height=\"357\" srcset=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3991-300x225.jpg 300w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3991-1024x768.jpg 1024w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3991-768x576.jpg 768w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3991-1536x1152.jpg 1536w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3991-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 476px) 100vw, 476px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17452 alignleft\" src=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_4100-300x225.jpg\" alt=\"\" width=\"479\" height=\"359\" srcset=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_4100-300x225.jpg 300w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_4100-1024x768.jpg 1024w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_4100-768x576.jpg 768w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_4100-1536x1152.jpg 1536w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_4100-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 479px) 100vw, 479px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17453 alignleft\" src=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3935-300x225.jpg\" alt=\"\" width=\"504\" height=\"378\" srcset=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3935-300x225.jpg 300w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3935-1024x768.jpg 1024w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3935-768x576.jpg 768w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3935-1536x1152.jpg 1536w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/IMG_3935-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 504px) 100vw, 504px\" \/><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17451 alignleft\" src=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/George-Washington-Monument-225x300.jpg\" alt=\"\" width=\"281\" height=\"375\" srcset=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/George-Washington-Monument-225x300.jpg 225w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/George-Washington-Monument-768x1024.jpg 768w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/George-Washington-Monument-1152x1536.jpg 1152w, https:\/\/beaconny.gov\/wp-content\/uploads\/2024\/08\/George-Washington-Monument.jpg 1512w\" sizes=\"auto, (max-width: 281px) 100vw, 281px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Fishkill Avenue and Teller Avenue Rehabilitation Project Project updates will be updated here, as available. Project plans can be viewed here. August 29, 2024: After more than twenty years of [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":14080,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-17450","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rehabilitation of Fishkill and Teller Avenues Project Updates &#8212; City of Beacon<\/title>\n<meta name=\"description\" content=\"The Official Website of the City of Beacon, NY\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rehabilitation of Fishkill and Teller Avenues Project Updates &#8212; City of Beacon\" \/>\n<meta property=\"og:description\" content=\"The Official Website of the City of Beacon, NY\" \/>\n<meta property=\"og:url\" content=\"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Beacon\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/beaconnyhttps%3a\/\/twitter.com\/cityofbeacon\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-29T20:56:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-30T13:40:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/beaconny.gov\/wp-content\/uploads\/2022\/04\/road-work-ahead.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Benjamin Swanson\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@cityofbeacon\" \/>\n<meta name=\"twitter:site\" content=\"@cityofbeacon\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Benjamin Swanson\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/\"},\"author\":{\"name\":\"Benjamin Swanson\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#\\\/schema\\\/person\\\/5aba0c9250bfc20ab168ccf70ca3a7c7\"},\"headline\":\"Rehabilitation of Fishkill and Teller Avenues Project Updates\",\"datePublished\":\"2024-08-29T20:56:15+00:00\",\"dateModified\":\"2024-08-30T13:40:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/\"},\"wordCount\":337,\"publisher\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/beaconny.gov\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/road-work-ahead.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/\",\"url\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/\",\"name\":\"Rehabilitation of Fishkill and Teller Avenues Project Updates &#8212; City of Beacon\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/beaconny.gov\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/road-work-ahead.jpg\",\"datePublished\":\"2024-08-29T20:56:15+00:00\",\"dateModified\":\"2024-08-30T13:40:57+00:00\",\"description\":\"The Official Website of the City of Beacon, NY\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/#primaryimage\",\"url\":\"https:\\\/\\\/beaconny.gov\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/road-work-ahead.jpg\",\"contentUrl\":\"https:\\\/\\\/beaconny.gov\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/road-work-ahead.jpg\",\"width\":600,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/2024\\\/08\\\/29\\\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/beaconny.gov\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rehabilitation of Fishkill and Teller Avenues Project Updates\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#website\",\"url\":\"https:\\\/\\\/beaconny.gov\\\/\",\"name\":\"City of Beacon\",\"description\":\"The Official Website of the City of Beacon, NY\",\"publisher\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/beaconny.gov\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#organization\",\"name\":\"City of Beacon\",\"url\":\"https:\\\/\\\/beaconny.gov\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/beaconny.gov\\\/wp-content\\\/uploads\\\/2019\\\/08\\\/beacon-seal-e1565628438716.png\",\"contentUrl\":\"https:\\\/\\\/beaconny.gov\\\/wp-content\\\/uploads\\\/2019\\\/08\\\/beacon-seal-e1565628438716.png\",\"width\":125,\"height\":125,\"caption\":\"City of Beacon\"},\"image\":{\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/beaconnyhttps:\\\/\\\/twitter.com\\\/cityofbeacon\",\"https:\\\/\\\/x.com\\\/cityofbeacon\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/beaconny.gov\\\/#\\\/schema\\\/person\\\/5aba0c9250bfc20ab168ccf70ca3a7c7\",\"name\":\"Benjamin Swanson\",\"url\":\"https:\\\/\\\/beaconny.gov\\\/index.php\\\/author\\\/bswanson\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rehabilitation of Fishkill and Teller Avenues Project Updates &#8212; City of Beacon","description":"The Official Website of the City of Beacon, NY","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/","og_locale":"en_US","og_type":"article","og_title":"Rehabilitation of Fishkill and Teller Avenues Project Updates &#8212; City of Beacon","og_description":"The Official Website of the City of Beacon, NY","og_url":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/","og_site_name":"City of Beacon","article_publisher":"https:\/\/www.facebook.com\/beaconnyhttps%3a\/\/twitter.com\/cityofbeacon","article_published_time":"2024-08-29T20:56:15+00:00","article_modified_time":"2024-08-30T13:40:57+00:00","og_image":[{"width":600,"height":600,"url":"https:\/\/beaconny.gov\/wp-content\/uploads\/2022\/04\/road-work-ahead.jpg","type":"image\/jpeg"}],"author":"Benjamin Swanson","twitter_card":"summary_large_image","twitter_creator":"@cityofbeacon","twitter_site":"@cityofbeacon","twitter_misc":{"Written by":"Benjamin Swanson","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/#article","isPartOf":{"@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/"},"author":{"name":"Benjamin Swanson","@id":"https:\/\/beaconny.gov\/#\/schema\/person\/5aba0c9250bfc20ab168ccf70ca3a7c7"},"headline":"Rehabilitation of Fishkill and Teller Avenues Project Updates","datePublished":"2024-08-29T20:56:15+00:00","dateModified":"2024-08-30T13:40:57+00:00","mainEntityOfPage":{"@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/"},"wordCount":337,"publisher":{"@id":"https:\/\/beaconny.gov\/#organization"},"image":{"@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/#primaryimage"},"thumbnailUrl":"https:\/\/beaconny.gov\/wp-content\/uploads\/2022\/04\/road-work-ahead.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/","url":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/","name":"Rehabilitation of Fishkill and Teller Avenues Project Updates &#8212; City of Beacon","isPartOf":{"@id":"https:\/\/beaconny.gov\/#website"},"primaryImageOfPage":{"@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/#primaryimage"},"image":{"@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/#primaryimage"},"thumbnailUrl":"https:\/\/beaconny.gov\/wp-content\/uploads\/2022\/04\/road-work-ahead.jpg","datePublished":"2024-08-29T20:56:15+00:00","dateModified":"2024-08-30T13:40:57+00:00","description":"The Official Website of the City of Beacon, NY","breadcrumb":{"@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/#primaryimage","url":"https:\/\/beaconny.gov\/wp-content\/uploads\/2022\/04\/road-work-ahead.jpg","contentUrl":"https:\/\/beaconny.gov\/wp-content\/uploads\/2022\/04\/road-work-ahead.jpg","width":600,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/beaconny.gov\/index.php\/2024\/08\/29\/rehabilitation-of-fishkill-and-teller-avenues-project-updates\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/beaconny.gov\/"},{"@type":"ListItem","position":2,"name":"Rehabilitation of Fishkill and Teller Avenues Project Updates"}]},{"@type":"WebSite","@id":"https:\/\/beaconny.gov\/#website","url":"https:\/\/beaconny.gov\/","name":"City of Beacon","description":"The Official Website of the City of Beacon, NY","publisher":{"@id":"https:\/\/beaconny.gov\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/beaconny.gov\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/beaconny.gov\/#organization","name":"City of Beacon","url":"https:\/\/beaconny.gov\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/beaconny.gov\/#\/schema\/logo\/image\/","url":"https:\/\/beaconny.gov\/wp-content\/uploads\/2019\/08\/beacon-seal-e1565628438716.png","contentUrl":"https:\/\/beaconny.gov\/wp-content\/uploads\/2019\/08\/beacon-seal-e1565628438716.png","width":125,"height":125,"caption":"City of Beacon"},"image":{"@id":"https:\/\/beaconny.gov\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/beaconnyhttps:\/\/twitter.com\/cityofbeacon","https:\/\/x.com\/cityofbeacon"]},{"@type":"Person","@id":"https:\/\/beaconny.gov\/#\/schema\/person\/5aba0c9250bfc20ab168ccf70ca3a7c7","name":"Benjamin Swanson","url":"https:\/\/beaconny.gov\/index.php\/author\/bswanson\/"}]}},"_links":{"self":[{"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/posts\/17450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/comments?post=17450"}],"version-history":[{"count":0,"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/posts\/17450\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/media\/14080"}],"wp:attachment":[{"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/media?parent=17450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/categories?post=17450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/beaconny.gov\/index.php\/wp-json\/wp\/v2\/tags?post=17450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}